Regular Maintenance Checklist For Closed Circuit Cooling Towers
Jan 10, 2026
Leave a message

I. Daily Inspection (Each day or shift)
Visual and Auditory Check: Observe if operation is smooth; listen for abnormal vibration or noise.
Water Quality and Level: Check the water level in the spray water (external circuit) collection basin; observe if the water is clear and free of obvious impurities or foam.
Instrument Parameters: Record key operational data such as inlet/outlet water temperature, pressure, and current.
Leak Check: Quickly inspect the equipment and pipe connections for any signs of leakage.
II. Weekly Maintenance
Cleaning: Remove floating debris (e.g., leaves, plastic) from the surface of the collection basin.
Nozzle Check: Observe if spray water distribution is even to preliminarily identify any blockages.
Fastening Check: Manually check visible bolts and terminal connections for looseness.


III. Monthly Maintenance
Deep Cleaning of Spray System: Clean the spray water filter (e.g., Y-strainer).
Nozzle Unclogging: Remove and clear some spray nozzles to ensure unobstructed water flow and even distribution.
Electrical Check: Tighten electrical connection points in the main power supply and control cabinet; check the status of the electrical control system.
Fan Check: Inspect fan blades for surface cleanliness; manually rotate the fan to confirm smooth movement.
IV. Quarterly Maintenance
Coil Cleaning: Use a low-pressure water gun (pressure ≤ 0.3MPa) to rinse the external surface of the coils from top to bottom, removing dust, pollen, algae, and other deposits.
Drive Component Check: Check and adjust fan belt tension (if belt-driven); check gearbox oil level and quality.
Structural Inspection: Inspect the tower structure and connectors for corrosion or looseness.
Water Quality Testing and Analysis: Sample and test spray water and internal circulating water (if applicable); adjust the water treatment program based on the results.


V. Annual/Seasonal Maintenance (Typically during seasonal shutdowns)
Comprehensive Chemical Cleaning: Perform chemical cleaning on the spray water system and internal circuit (as needed) based on water conditions to thoroughly remove scale and biological sludge.
Coil Inspection and Leak Test: Conduct a pressure test or inspection on the heat exchanger coils to ensure no leaks. Focus on welds and elbow joints.
Bearing Maintenance: Clean the bearings of fans and pumps; replace grease or lubricating oil.
Comprehensive Corrosion Protection: Inspect the anti-corrosion coating on the tower body and frame; grind and repaint any corroded areas.
Instrument Calibration: Calibrate sensors and instruments for temperature, pressure, flow rate, etc.
Safety Device Testing: Test the effectiveness of safety devices such as vibration switches and overload protection.
Internal Cleaning: Completely drain and clean sludge from the bottom of the collection basin and water tank.
VI. Maintenance for Special Climates or Operating Conditions
Before Winter: Focus on implementing freeze protection measures (draining, adding antifreeze, checking heat trace cables).
After Sandstorm or Pollen Season: Immediately increase the frequency of rinsing the external coil surfaces.
After Long-Term Shutdown: Before restarting, perform a comprehensive inspection and cleaning according to the "Annual Maintenance" standard.

Send Inquiry





